The project list keeps growing.
- Mud the hallway so the wife can paint it after it’s been stripped to the drywall (and then some).
- Finish building the joiner’s chest. This has subprojects:
- Finish planing the first end to thickness and avoid knots in the future.
- Sharpen the plane irons for the new planes
- Finish smoothing and jointing the boards on hand to create the top, front, back, and other side.
- Repair the broken saw handle.
- Take the handle off the saw panel.
- Clean the saw panel.
- Sharpen the saw.
- Preserve the saw.
- Reattach the handle.
- Repeat for the crosscut saw.
- Get the rest of the lumber needed
- Finish the required sides and top.
- Smooth and plane to thickness the bottom boards.
- Rabbet the bottom boards (learn how to cut nice rabbets.
- Fill the joiner’s chest in an organized way.
- Build a new 6 board chest for Ally to use in reenacting.
- Build a couple of stools.
- Create a new nut and screw for the leg vise at the Fort.
- Install and configure a new Ceph node to replace an existing node.
- Upgrade the Ceph cluster.
- Build, populate, and configure a new Ceph server.
- Make the new “managed” switch do switching stuff.
- Move the current switch from the internal net to the DMZ
- Loose more weight
- Exercise more.
Boring, but it just keeps growing, and after my wife reads it, I expect her to add to it.